5
Commissioning
5.1
Switch on
Open housing (anticlockwise).
Connect battery(ies).
Close housing (clockwise).
Connect to the mains.
Menu 0 System info|
Check whether |
(Indicates successful system test)
Green LED indicates standby state (ready for operation).
5.2
Carrying out initialisation
During initialisation, the following input is expected:
|Language|
|Date / Time|
|Product type|
|Maintenance interval|
Language
► Press OK.
► Use the cursor keys to select the language and confirm
with OK.
|Date/Time|
Menu
appears.
Date / Time
► Set the respective flashing figure in date and time and
confirm with OK.
|Product type|
Menu
Product type
► Select product type and confirm with OK.
Selection affects which setting options are available.
|Maintenance interval|
Menu
Maintenance interval
► Enter the maintenance interval specified in the standard.
Initialisation is completed, control unit is ready for use.
The first time pressing of the OK button activates control
mode at the control unit. (The display lights up).
Overview menu
The control menu is split into four menu areas:
0 System info - selected system, configured sensors, current measured values; if applicable, events or error messages
1 Information - display of the operating data (e.g. voltage, current measured values, logbook or set parameters)
2 Maintenance - maintenance-relevant tasks (e.g. switch pump(s) on/off), self-diagnosis, maintenance date and interval)
3 Settings - setting of the switching levels, sensor and system configuration, configuration of the modem interface, resetting
the control unit
5.3
Acknowledge alarm
The control unit displays (alarm) messages as follows:
the alarm LED flashes red
an error message appears in the display,
an acoustic signal
Press acknowledge alarm button for 1 second.
Acoustic signal is muted, LED stops flashing.
010-910_02
All manuals and user guides at all-guides.com
appears.
appears.
appears.
3
1
4
Fig. 3: Navigating in the menu
(1)
(2)
Confirm by pressing "OK"
(3)
Scroll down
(4)
"ESC" - back
2
Scroll up
31 / 108