Télécharger Imprimer la page

GreenWorks Pro BPB80L00 Manuel D'opérateur page 9

Souffleuse à dos
Masquer les pouces Voir aussi pour BPB80L00:

Publicité

Les langues disponibles

Les langues disponibles

The front tube has two fixed positions. You can adjust the
length of the tube according to different needs.
11.6
INSTALL THE BATTERY PACK
WARNING
If the battery pack or charger is damaged, replace the
battery pack or the charger.
Stop the machine and wait until the motor stops before
you install or remove the battery pack.
Read, know, and do the instructions in the battery and
charger manual.
1. Align the lift ribs on the battery pack with the grooves in
the battery compartment.
2. Push the battery pack into the battery compartment until
the battery pack locks into place.
3. When you hear a click, the battery pack is installed.
11.7
REMOVE THE BATTERY PACK
1. Push and hold the battery release button.
2. Remove the battery pack from the machine.
11.8
ADJUST THE HARNESS
1. Fit the backpack on your back.
2. Pull the ends of the straps down to tighten the harness.
3. Connect the horizontal chest strap.
4. Pull the end of the chest strap to tighten.
NOTE
11
English
1
5. Lift the tabs of the adjusters to loosen the straps.
3
6. Lock the quick-release fastener by pushing it together.
7. Squeeze the hooks to open the quick-release fastener.
Install the back pad against your back tightly and safely.
9
2
4
NOTE
EN

Publicité

loading

Ce manuel est également adapté pour:

Blb484