Faber DAMA30SSV Instructions D'utilisation page 8

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

2
Draw a vertical line on the supporting wall as high as practical, at the center of the area in which
the hood will be installed.
Draw a horizontal line at where the bottom edge of the hood will be located as indicated in the figure
that is a minimum of 24" electric and 30" gas cooking surface clearance.
3
2.1
Draw a horizontal line where indicated at the bottom edge of the vent hood at the desired height above
the cooking surface.
Place a bracket 7.2.1 on the wall as shown about 1/8" from the ceiling or upper limit, aligning the
centers(notch) with the vertical reference line and mark the wall at the centers of the holes in the bracket.
Place the second bracket 7.2.1 on the wall as shown, below the first bracket, at the height of the
upper chimney section supplied and aligning the centers(notch) with the vertical line.
Attention: If the position of the second bracket (7.2.1,) below the first bracket is less than 19 1/2" from
the horizontal reference line, then the second bracket cannot be fixed.
Mark the wall at the centers of the holes in the bracket and mark the point 1 and 2 for the Hood Body
installation as show (16
Drill ø 5/16" holes at all the centers points marked (point 1,2,3,4,5,6) as shown.
8
" from the horizontal line and 4
9/16
7.2.1
x6
" from the vertical line).
9/16
x6

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Dama36ssvDama

Table des Matières