Télécharger Imprimer la page

Yamaha YZ125 2002 Manuel D'atelier Du Proprietaire page 296

Publicité

KICK AXLE, SHIFT SHAFT AND PRIMARY DRIVE
GEAR
EC4C5000
ASSEMBLY AND INSTALLATION
EC4C5120
Stopper lever
1. Install:
9 Torsion spring 1
9 Stopper lever 2
9 Spacer 3
9 Bolt (stopper lever) 4
NOTE:
9 Align the stopper lever roller with the slot on
segment.
9 When installing the stopper lever, make sure
that the torsion spring is in the position as
shown.
EC4C5202
Shift guide and shift lever assembly
1. Install:
9 Spring 1
9 Pawl pin 2
9 Pawl 3
To shift lever 4.
2. Install:
9 Shift lever assembly 1
To shift guide 2.
3. Install:
9 Shift lever assembly 1
9 Shift guide 2
NOTE:
9 The shift lever assembly is installed at the
same time as the shift guide.
9 Apply the transmission oil on the bolt (seg-
ment) shaft.
4-42
ENG
10 Nm (1.0 m•kg, 7.2 ft•lb)

Publicité

loading

Ce manuel est également adapté pour:

Yz125lc 2002Yz125rlc 2002