Télécharger Imprimer la page

Norwood LumberPro HD36V2 Instructions Originales page 23

Publicité

Les langues disponibles
  • FR

Les langues disponibles

CABLE INSTALLATION: Some cable ties, cable tie adhesive mounts and cable split loom
tubing have been provided to you so you can keep the cabling out of your way and to keep your
workspace and equipment organized. Use it at your convenience.
WARNING: BEFORE YOU TURN THE POWER ON (LumberPro HD36v2 owners only)
The control panel that you purchased for your LumberPro HD36v2 is equipped with a 12 V DC
converter to provide power to the optional Setworks (HD36-5000-SW) or Power Feed & Power
Sawhead (HD36-5000).
One black cable, with two wires, comes out of the control panel to provide the 12 V DC power. IF you have
not purchased these two optional attachments, you do not need the 12 V DC power, so you need to have a
certified electrician to neutralise this cable when the power is turned OFF.
One way to achieve it: you can shorten this cable if necessary and you could cover the end of both of the
wires with the appropriate electrical insulating tape.
MILL-ELEC-S1-INST (2022-04-04).indd 19
MILL-ELEC-S1-INST (2022-04-04).indd 19
Re-install the cable clamp and secure the
cable so it can't be pulled out.
WARNING! Risk of electrocution.
Failing to do so can result in live
wires being exposed.
Re-install the terminal box cover using all
four screws previously removed.
2022-04-04 6:18:58 PM
2022-04-04 6:18:58 PM

Publicité

loading

Ce manuel est également adapté pour:

Lumberpro hd36Lumbermate lm30Lumberman mn27