Télécharger Imprimer la page

Mopar 2008-13 Instructions D'installation page 3

Publicité

Les langues disponibles

Les langues disponibles

16. Position the center bezel (2) near the instrument panel (1).
17. Connect the electrical connectors for the A/C control, heated
seat switches, if equipped, and the hazard switch.
18. Install the center bezel onto the instrument panel and carefully
push on the outside edges of the center bezel to fully seat the
snap clip retainers.
19. Connect the negative battery cable.
NOTE: The A/C-heater control automatically performs the Actuator Calibration function when the ignition is
initially turned on when installing a new control or reinstalling the original control. However, the Actuator Cal-
ibration function must be manually initiated using a scan tool if the A/C-heater control has been previously
installed in another vehicle.
20. If required, initiate the Actuator Calibration function using a scan tool.
04/14/2008
3
K6860623 Rev. 1

Publicité

loading

Produits Connexes pour Mopar 2008-13