Mark Upper Cabinet
1. Using measuring tape, and clearly mark the vertical centerline
of the opening. Make sure it is align with the vertical wall
centerline.
A
B
A. Upper Cabinet Centerline
B. Wall Centerline
The upper cabinet template is fit for depth of 13" (35 cm) to
16" (40.6 cm) cabinet installation, but need some adjustment
for different depth. See the following steps.
2. Using measuring tape, measure the depth of the cabinet. The
upper cabinet template is for variable cabinet depth use, find
a dimension of your cabinet in below table.
Flush Depth (cabinet + door)
13
3
/
" < Deeper ≤ 14"
4
L
(35 cm < Deeper ≤ 35.6 cm)
14
/
" < Deeper ≤ 14
/
1
1
4
2
M
(36.2 cm < Deeper ≤ 36.8 cm)
14
/
" < Deeper ≤ 15"
3
4
N
(37.5 cm < Deeper ≤ 38.1 cm)
15
/
" < Deeper ≤ 15
/
1
1
4
2
P
(38.7 cm < Deeper ≤ 39.4 cm)
15
/
" < Deeper ≤ 16"
3
4
R
(40 cm < Deeper ≤ 40.6 cm)
NOTE: There are two install methods, one is flush to the
cabinet door, another one is stand-out from the cabinet
door. Find the dimension of your cabinet in above table, the
dimensions in the left colomn are flush to the cabinet door,
the dimensions in the right colomn are stand-out from the
cabinet door.
Flush to the cabinet door, front allignment installation,
follow below steps:
3. For example, the cabinet depth is 14" (35.6 cm), you need to
cut or fold the grey portion of the upper cabinet template.
6
Stand-out Depth
(cabinet + door)
13" < Deeper ≤ 13
3
(33 cm < Deeper ≤ 35 cm)
"
14" < Deeper ≤ 14
1
(35.6 cm < Deeper ≤ 36.2 cm)
14
/
" < Deeper ≤ 14
1
2
(36.8 cm < Deeper ≤ 37.5 cm)
"
15" < Deeper ≤ 15
1
(38.1 cm < Deeper ≤ 38.7 cm)
15
/
" < Deeper ≤ 15
1
2
(39.4 cm < Deeper ≤ 40 cm)
4. Place and tape the upper cabinet template against the
bottom of the upper cabinet.
NOTES:
Make sure the front edge of the upper cabinet template
■
align with the front edge of upper cabinet.
Make sure the center marks on the upper cabinet
■
template align with the upper cabinet centerline which
draw in step 1.
D
A. Front Edge of the Upper Cabinet Template
B. Upper Cabinet Centerline
C. Arrows on Upper Cabinet Template
D. Center Marks on Upper Cabinet Template
/
"
4
NOTE: If the upper cabinet doors protrude from the upper
cabinet, the template can be adjusted outward to be flush
/
"
4
with the upper cabinet door.
/
"
3
4
/
"
4
Cabinet
/
"
3
4
Bump Out Mounting Plate
Stand-out from the cabinet door, back allignment
installation, follow below steps:
5. For example, the cabinet depth is 13
to cut or fold the grey portion of the upper cabinet template.
C
and Front Edge of Upper Cabinet
B
2 7/8'' (7.2 cm)
(Front alignment)
(Alineación frontal)
UPPER CABINET TEMPLATE /
(Alignement avant)
PLANTILLA PARA EL GABINETE SUPERIOR /
GABARIT POUR PLACARD SUPÉRIEUR
D
D/E: Upper cabinet mounting holes.
F: Roof-venting area.
(Rear alignment)
G: Power supplier cord hole.
(Alineación trasera)
D/E: Orificios para el montaje del gabinete superior.
(Alignement arrière)
F: Zona de ventilación del techo.
A
G: Orificio para el cable de alimentación de energía.
D/E : Trous de fixation du coffret supérieur
F : Zone d'évacuation du toit
G : Trou du cordon d'alimentation.
12 1/2'' (31,8 cm)
6 1/4'' (15,9 cm)
Microwave
oven door
A. Front Edge of Template
B. Upper Cabinet Door
/
" (34.2 cm), you need
1
2
A
B
2 7/8'' (7.2 cm)
(Front alignment)
(Alineación frontal)
(Alignement avant)
E
P/N: W11646786A
(Rear alignment)
(Alineación trasera)
(Alignement arrière)
6 3/8'' (16,2 cm)
G
(Rear alignment)
(Alineación trasera)
(Alignement arrière)
F
4 3/4''
(12,1 cm)