FAK-
FAK-
/V/
L-
BA9s
2.4 W
1
Safety and application notes
en
Can be installed in any position.
Install the emergency stop unit in
such a way that the operator is
protected against penetrating
foreign particles,
e.g., swarf, sand, etc.
If emergency stop devices are connected in series, the performance
level as defined in EN ISO 13849-1 may become lower due to reduced
fault detection capabilities.
When using emergency stop applications, it is required for the overall
system to be validated as specified in EN ISO 13849-2.
Max. short-circuit protective device
Fuseless
PKZM0-10/FAZ-B6/1
gG/gL
10 A
2/8
FAK-
+ L-
M 1:1
2
8 mm (0.31)
0.8 Nm (M = 7.08 lb-in)
2 x 0.5 - 1.5 mm
1
2
R22-MS
3
Regular maintenance activities
Check the emergency stop
unit to ensure that it has a
secure mechanical fit.
Check the cable
connections to make sure
they are in good condition.
L-...
M20
(PG13.5)
M16
36 mm
M20
(1.42")
(PG13.5)
65 mm (2.56")
2
Sicherheits- und Anwendungshinweise
de
Einbaulage beliebig.
NOT-AUS-Einrichtung so montieren,
dass der Betätigungskopf gegen
eindringende Verschmutzung,
z. B. Späne, Sand etc. geschützt ist.
Bei Hintereinanderschaltungen von NOT-AUS-Geräten kann sich der
Performance-Level nach EN ISO 13849-1 auf Grund verringerter
Fehlererkennung reduzieren.
Bei Verwendung von NOT-AUS-/NOT-HALT-Applikationen ist
grundsätzlich eine Validierung der Gesamtanlage nach EN ISO 13849-2
erforderlich.
max. Kurzschlussschutzeinrichtung
schmelzsicherungslos
PKZM0-10/FAZ-B6/1
gG/gL
10 A
M5
N
4
F
F
3
F
Regelmäßige Wartungsschritte
NOT-AUS-Einrichtung auf
festen mechanischen Sitz
prüfen.
Leitungsanschlüsse auf
Unversehrtheit prüfen.