This Flow Chart will teach
you the steps to follow to
protect your heater.
INSTALLATION
When heating is not required for
less than a week you MUST leave
the Bypass valves open to let the
water circulate in the unit. If the heat
exchanger is deprived of water
circulation for more than 72 hours,
high chlorine could cause excessive
corrosion.
MAINTENANCE
INSTALLATION
- Verify that the installation was done
according to owner's manual instructions.
FIRST TIME OR SPRING STARTUP
- Hook up pool water piping but do not
hook up the Heater yet.
VERIFY & BALANCE POOL CHEMICAL
NO
POOL CHEMICAL OK?
HOOK UP WATER PIPING TO HEATER
SET REQUIRED WATER
TEMPERATURE ON TOUCH PAD
IMPORTANT FOR THE HEALTH OF YOUR FAMILY
AND FOR YOUR POOL HEATER
- Verify Chlorine or Bromine level every 2-3 days.
- Verify pH level once a week.
- Verify Alkalinity level every 3-4 weeks (More often if you own
an Automatic Chlorine or Bromine Feeder.)
- Verify Calcium Hardness once a month.
(Above tests can easily be done by yourself with a do it yourself kit.)
NO
HEATING WILL NOT BE REQUIRED
FOR MORE THAN A WEEK?
Shut Bypass valves and disconnect waterlines
NO
PROTECT HEATER BY COVERING IT
YES
YES
to drain the HEATER.
HEATING NEEDED?
NO
IS IT POOL CLOSING
TIME?
YES
CLOSE POOL