CONNECT DECORATIVE FLUE
DUCTED INSTALLATION ONLY
Note: Rooms with 10 or 11 foot ceilings
require flue extension model AEIPP9SB,
available from your local dealer. Discard
the flues and frame supplied with the
range hood and replace with the flues
and frames included in the kit.
1. Fix the duct connector onto the hood using
2 screws (3.9x9.5mm) located in the
Hardware Package (Fig.9).
2. Place the upper flue and lower flue over
the support frame (Fig.10).
3. Mount the support frame/hood assembly
to the ceiling using the (4) previously
installed 6x70mm screws. Tighten these
screws. Install (2) additional 6x70mm
screws as shown in the illustration. Make
sure all (6) screws are secure.
4. Use 10" round metal duct to connect the
duct collar on the hood to the ductwork
above (Fig.11).
5. Use duct tape to make all joints secure and
air tight.
6. Tape all openings on top surface of range
hood (Fig.12).
10" ROUND
METAL DUCT
FIG. 11
- 11 -
MOUNTING
SCREWS
3,9x9,5mm
FIG.9
FIG. 10
FIG. 12