Astralpool PRO-ELYO INVERBOOST 7-3.6 Manuel D'installation Et D'utilisation page 60

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 13
2.1 Delivery of the packaging
For the transportation, the heat pump is fix on the pallet and cover with a carton box.
To preserve from any damage, the heat pump must be transfer on is pallet.
All material, Even if the transport is chargeable to supplier, can be damaged during its routing at the customer
and it is the responsibility of the addressee to make sure of the correspondence of the delivery
The addressee has to written all the reserves at the reception on the delivery note of the carrier if he notices
damages of the packaging. DO NOT FORGET TO CONFIRM BY REGISTERED LETTER TO THE
CARRIER UNDER 48 H.
2.2 Stock advertising
Heat pump must be stored and transfer in vertical position in its original packaging. If it is not the case, she
cannot be operated at once, a minimum period of 24H is necessary before to switch on the electrical power.
2.3 Transfer to the final position
During the unpacking of the product and the transfer from is palette of origin to final place, it is necessary to
maintain the heat pump vertical position.
Water connection are not there to assure the function of handle, on the contrary support the weight of the heat
pump on the water connection must be damage definitively the product. The manufacturer could not be take
the responsible in case of damage.
2
.
T
r
a
n
s
p
o
r
t
a
d
v
2
.
T
r
a
n
s
p
o
r
t
a
d
2
.
T
r
a
n
s
p
o
r
t
a
d
FORBITTEN
3
.
S
p
e
c
i
f
i
c
a
t
3
.
S
p
e
c
i
f
i
c
a
t
3
.
S
p
e
c
- 56 -
i
f
i
c
a
t
e
r
t
i
s
i
n
g
v
e
r
t
i
s
i
n
g
v
e
r
t
i
s
i
n
g
i
o
n
s
i
o
n
s
i
o
n
s

Publicité

Table des Matières
loading

Table des Matières