Télécharger Imprimer la page

OLIJU CHS Serie Instructions page 2

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 8
1. GENERAL WARNINGS 
‐ Read this manual carefully before installing this pump. 
It contains every necessary information for installation, 
correct use and maintenance of CHS pumps. 
‐  It's  very  important  that  the  user  reads  this  manual 
before using the pump. Any damage caused by failure 
to observe the directions contained in this manual will 
not be covered by warranty. 
‐ By the time you receive this pump check 
if  it  wasn´t  damaged  during  transpor‐
tation. 
‐  In  this  case,  please  contact  our  agent  as  soon  as 
possible. 
 
2. OPERATING CONDITIONS: 
‐ The CHS are centrifugal multistage pumps and have 
been designed to work with clean water at a maximum 
temperature of 35º C. 
‐ Maximum starts/hour: 30 at regular intervals. 
 
3. INSTALLATION: 
‐  The  pump  should  be  fixed  to  a  solid  base  by  bolts 
through  the  holes  in  the  pump  bracket  in  order  to 
prevent unwanted noise or vibration. 
‐  You  should  place  pump  as  near  as 
possible  to  water  level  so  to  have  the 
minimum  suction  lift  and  reduce  loss  of 
head. 
‐ Make sure that pump is never submerged and that it 
rests in a dry and well aired room. 
 
4. PIPES ASSEMBLY: 
‐  Suction  pipe  (Pic.  1)  must  be  the  same  or  lower 
diameter than the pump inlet and must always remain 
in na upward inclination of 2% so to help with correct 
priming. 
‐  A  foot  valve  with  filter  should  be  installed  and 
submerged  to  at  least  30cm  below  the  well  dynamic 
level to prevent air from entering the pump. 
‐ Be sure that discharge pipe (Pic. 1) should never rest 
on top of the pump. 
 
 
DELIVERY
 
 
 
 
 
 
 
 
 
 
SUCTION PIPE 
 
2  
5. ELECTRICAL CONNECTION: 
‐  The  single‐phase  motors  have  a  built‐in  thermal 
protection. 
‐  The  electrical  installation  must  have  a  system  of 
multiple separations with contact opening of at least 3 
mm. 
‐  The  protection  of  the  system  will  be  based  on  a 
differential swith ( I fn = 30 ma). 
‐  The  electric  cable  must  correspond  to  the  EEC  (2) 
norm or to the type H07 RN‐F. 
‐  With  three‐phase  motors,  end‐user  must  install 
himself the correct protection to the pump as per the 
aproppiate installation regulations. 
 
 
 
 
 
 
 
 
 
 
Pic.2 
 
 
‐  Follow  directions  on  Pic.3.  for  a  correct  electrical 
connection. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
6. CONTROLS PRIOR TO THE INITIAL 
STARTING: 
‐ Check that voltage and frequency correspond to 
those indicated on the technical characteristics label. 
‐ Make sure the motor shaft is turning freely. 
‐ Fill pump body completely with water, as well as the 
suction pipe, through the priming hole (Pic. 4). Check 
that there is no leaking through joints or connections. 
Pic.1 
 
EN 
SINGLE PHASE 
SUPPLY 
THREE PHASE SUPPLY 
Pic.3 
 

Publicité

loading

Produits Connexes pour OLIJU CHS Serie