English
6
Installation
6.1 General
The device should always be installed on a permanently
smooth, even and horizontal surface. The entire frame should
be in direct contact with the ground in order to ensure an ade-
quate soundproof seal and to prevent the water-bearing com-
ponents from becoming too cold. If this is not the case, ad-
ditional insulation measures may be necessary. Furthermore,
the heat pump should be set up so that the air outlet direction
of the fan is perpendicular to the main wind direction to allow
unrestricted defrosting of the evaporator. The heat pump is de-
signed for installation on even ground. In the case of different
conditions (e.g.: installation on a platform or flat roof) or there is
a greater risk of the heat pump tipping over (due to an exposed
position or high wind exposure), additional protection against
tipping over must be provided. The responsibility for the heat
pump installation lies with the specialist system construction
company. During the installation, local requirements such as
building regulations, static load of the building, and wind expo-
sure must be accounted for.
It must be possible to carry out maintenance work without hin-
drance. This is ensured when observing the distances to solid
walls as shown in the figure.
0,4 m
0,5 m
≥ 0 m
The specified dimensions are valid for stand-alone installation
only.
NOTE
The heat pump is not intended for use over 2000 metres
above sea level.
CAUTION!
Do not restrict or block the area around the air intake or outlet
area.
CAUTION!
Observe country-specific building regulations!
CAUTION!
The physical impacts must be observed for installation close
to walls. No windows or doors should be present in the area
surrounding the air outlet of the fan.
EN-6
CAUTION!
In cases of installation close to a wall, there may be more
sediment in the air inlet and outlet areas due to the air current.
The colder outside air outlet should discharge in such a way as
to not increase the heat losses in heated neighbouring rooms.
CAUTION!
Installation in a hollow or in an inner courtyard is not
permitted because cooled air collects at ground level and is
drawn in again by the heat pump during extended periods of
operation.
6.2 Condensate pipe
Condensed water that forms during operation must be drained
off frost free. To ensure proper drainage, the heat pump must
be mounted horizontally. The condensate pipe must have a
minimum diameter of 50 mm and must be fed into a sewer in
such a way that it is safe from frost. Do not discharge the con-
densate directly into clearing tanks or cess pits. The aggressive
vapours and a condensate pipe laid in an area which is not
frost-free can destroy the evaporator.
2,0 m
CAUTION!
The frost line can vary according to the climatic region. The
regulations of the countries in question must be observed.
7
Assembly
7.1 General
The following connections need to be established on the heat
pump:
Flow and return of the heating system
Condensate drain
Control cable to the heat pump manager
Power supply
To access the inside of the device, all side panel assemblies can
be removed as described in Cap. 5 on pag. 5.
452168.66.31 · FD 0210
LA 0712BW(C)
www.glendimplex.de