Prepare the Site (cont.)
NOTICE: Adequate floor support is required. The wood support must
be a minimum of 2" (51 mm) thick by 6" (152 mm) wide. 2x6 lumber is
NOT adequate for this application.
NOTE: Concrete can be used as the floor support.
Plan out the bath filler placement based on the dimensions above.
Cut a hole in the subfloor that is large enough to install the wood
support between two floor joists.
Secure the wood support between 2-1/4" (57 mm) to 3-1/16" (78 mm)
below the top of the finished floor.
1443292-2-A
4
Kohler Co.