The Majolica Cladding; Hydraulic Installation - Ravelli HRV 180 PLUS Manuel D'utilisation Et D'entretien

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

The Majolica cladding

The Majolica cladding is artisan-crafted and hand-finished.
For this reason there may be minor imperfections on the surface such as slight discoloration and hair cracks, which are considered
characteristics that make each Majolica a unique piece.
Since the Majolica cladding is made with a delicate material, we recommend handling it with care during cleaning
and avoiding sudden impact that may cause damage.

Hydraulic installation

! IMPORTANT
Safety devices for open tank system
According to the standard UNI 10412-2: 2009 in force in Italy, the systems with an open expansion tank must be equipped with:
• Open expansion tank
• Safety tube
• Loading tube
• Circulator command thermostat (excluded for natural circulation systems)
• Circulation system (excluded for natural circulation systems)
• Acoustic alarm activation device
• Acoustic alarm
• Temperature indicator
• Pressure indicator
• Automatic blocking thermal switch (blocking thermostat)
Safety devices for closed tank system
According to the standard UNI 10412-2: 2009 in force in Italy, closed systems must be equipped with:
• Safety valve
• Circulator command thermostat
• Acoustic alarm activation thermostat
• Temperature indicator
• Pressure indicator
• Acoustic alarm
• Automatic regulation thermal switch
• Automatic blocking thermal switch (blocking thermostat)
• Circulation system
• Expansion system
Safety dissipation system built into the generator with thermal safety valve (self-activated), in case the the equipment is not
provided with an automatic temperature regulation system.
The appliances for domestic heating with automatic feeding system must be equipped with a block thermostat for the fuel or with
a cooling circuit provided by the manufacturer of the device, activated by a thermal safety valve that ensures that the compliant
temperature threhold set is not exceeded. Connection between the power supply unit and the valve must be without shut-offs.
Pressure upstream of the cooling circuit must at least be 1.5 bar.
Installation advice
After placing the boiler and installing all fume exhaust pipes, you can connect the hydraulic system. It is recommended to connect the
boiler to the system by means of ball valves or gate valves, in order to enable easy detachment, if needed. Before connection we
strongly recommend you carry out a thorough cleaning of the system. We recommend that you connect the vent of the safety valve
through a special pipe in order to prevent damage in case of overpressure or increase in temperature.
When filling the boiler, check that the Jolly valve (picture on the left) is working properly by venting the system. The maximum Loading
pressure with COLD water should be of 1 bar. In order to ensure proper operation with HOT water, the pressure in the stove should
be 1.5 bar. For installation of an additional expansion tank, remember that normally 1 litre of expansion tank compensates 10 litres of
the system and at least two litres are always dedicated to the water inside the stove.
! IMPORTANT
Correctly connect the stove to the hydraulic system, bringing pressure of the system to 0.8 or max 1 bar when the stove has not yet
been switched on (in the event the system is not a closed tank system, but has an open tank, it is necessary to change the setting on
the menu, which is reserved to authorised technician).
Now proceed to bleed the hydraulic system using the valve assembled on the boiler or using the valves assembled on the radiators.
This operation can be carried out multiple times, even after activation of the boiler since, from the time the temperature of the water
starts to increase, the air bubbles move towards the high part of the boiler. Once you have completed this operation, close the feeding
valve. While bleeding the boiler, ensure the electrical parts near the valve are not wet!In the event this occurs, do not turn on the
boiler, but proceed to dry the electronic board using a hairdryer.
Use and maintenance manual
PLUMBING MUST ALWAYS BE CARRIED OUT BY QUALIFIED PERSONNEL, ABLE TO
CARRY OUT A STATE-OF-THE-ART INSTALLATION IN COMPLIANCE WITH THE LAWS
IN FORCE IN THE COUNTRY OF INSTALLATION, AFTER HAVING READ THE NEXT
CHAPTER. RAVELLI DENIES ALL LIABILITIES FO DAMAGES TO PEOPLE OR PROPERTY
ARISINGFROM MALFUNCTIONS DUE TO FAILURE TO COMPLY WITH THIS WARNING
FILLING MUST BE CARRIED OUT USING A "T" JOINT PLACED ON THE HEATING SUPPLY,
LOADING TO A MAXIMUM OF 1 BAR WITH COLD WATER PERIODICALLY CHECK ON THE
CONTROL CONSOLES THE PRESSURE IN THE STOVE, AND KEEP IT STEADY AT 1 BAR.
HRV 180 PLUS
Rev.2 04/12/2020
Page 21
EN

Publicité

Table des Matières
loading

Table des Matières