EN
Installation and setting up
CAUTION Risk of crushing due to the heavy aquarium!
•
A filled aquarium could fall down during transport and cause injuries.
•
The aquarium must always be emptied beforehand and transported by two people.
Installation
The aquarium should be positioned so that prolonged staring into the luminaire at a distance closer than
0.25 m is not expected.
Please proceed as follows:
A
1. After unpacking the aquarium, open the hood and take out all the accessories.
Opening: First open the front lid in the aquarium hood. Then lift up the aquarium hood in the centre.
–
Closing: In the reverse order. Press down the aquarium hood.
–
2. Dust and dirt should be removed from the aquarium with a clean cloth and water.
–
Only use cleaning agents that are specifically recommended for aquariums.
3. To make sure that the aquarium still meets our high quality standards and has not developed a leak
during transport, we recommend filling it with water and allowing it to stand for 24 hours.
–
–
Maximum filling level: The maximum water level may not exceed 1 cm below the top edge of the
aquarium.
4. Set up the aquarium in the desired location.
–
The aquarium must be placed on a level, stable, water-resistant surface that can take the weight of
the aquarium and the water it will contain.
Ensure that properly earthed sockets are provided for connecting the electrical appliances.
–
The enclosed Tetra brochure gives you a few ideas of where you might place and set up your
–
aquarium.
–
Tetra also offers an excellent stand specifically for the aquarium.
4