5. Tighten screws if necessary, being careful not to over-tighten, and close the validator
assembly. The lower mount is difficult to access with a large screwdriver.
6. Remove the cassette. Lift it by the handle and pull toward you.
7. Fill the cassette with coins, ensuring the coins are inserted into the proper tubes.
8. Return the filled cassette to the coin changer and ensure it is properly seated.
9. Connect the MDB, EXEC, BDV, or VCCS cable.
If you have a note validator, connect the MDB or VCCS harness from the coin
changer to the note validator's Y connector.
b
a
Item
a
b
c
d
10. Use cable ties to secure any excess cabling inside the vending machine, ensuring
that the cables do not interfere with the vending machine or Gryphon coin changer
operation.
11. Restore power to the vending machine.
Gryphon
Description
To machine
Y connector
From note validator
To coin mechanism
© 2021 Crane Payment Innovations.
All rights reserved.
Coin Changer User Guide
™
c
d
EN 8