Installation Instruction - Step 2 - Royal Sovereign RTHD-431SS Manuel De L'utilisateur

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

INSTALLATION INSTRUCTION - STEP 2

1. Select the ideal mounting location for the hand dryer. Refer to Mounting the Unit for ideal height placement.
2. Use the supplied drill hole template sheet and proceed to mark and drill the holes as indicated.
3. If not done already, use the supplied Allen key and remove the hand dryer cover from the base.
4. During installation, ensure the Power button is turned "OFF" - ON/OFF button is located on the circuit board - refer to
Page 7 - HAND DRYER ON/OFF.
5. For plug-and-play operation, plug into the electrical outlet, ensuring the power supply cable is not exposed. For hard-
wired installation, ensure that the unit has the required power and is connected properly.
6. Select the Motor Setting (HI/LOW) to be utilized and ensure the POWER selector switch is turn "ON". Select Heat ON/
Heat OFF option (Preset to Heat On - Refer to Page 7 of Manual "Heating Control"). Test the setting selected by
placing your hand underneath the hand dryer.
7. Place the stainless steel cover back on the hand dryer unit and tighten the screws.
145mm
145mm
Fig1
Fig2
Fig4
9
RTHD-431SS
Fig3
Fig5

Publicité

Table des Matières

Dépannage

loading

Table des Matières