Non Standard Installations - Price Pfister TX8 Serie Manuel D'installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

16
16B
16A
16C
16 PLASTERGUARD REPLACEMENT
Replace plasterguard (16A) onto Cartridge (16B) and secure with Screws (16C).
Proceed to finish wall.
17
1 1 / 4 " DIA
1 1 / 4 " DIA
17 FINISH WALL PREPARATION
Make appropriate holes to finished wall. Price Pfister recommends that all Tub Spout
and Shower Outlet holes be 1 1 / 4 " diameter. For center hole on plaster wall use 4
3 / 4 " diameter.
CAUTION: Make sure that leak tests and flushing are performed before preparing
the finished wall.
ENGLISH
18
18 THIN WALL INSTALLATION
Knock out Center Section (18A) of Plaster Guard (18B) and remove Screws (18D). For
installation of thin walls, use Support Plate (18C) in addition to Plaster Guard (18B). For
installation to other wall types, do not use Support Plate (18C). Use of Plaster Guard
(18B) is optional. For center hole on a thin wall use 4" diameter.
19
4 3 / 4 " DIA
19 REVERSED INLET LINES
If hot and cold inlets are reversed (back-to-back installation), (19C) unscrew the
plasterguard and bonnet assembly. Rotate the Bonnet Assembly (19A) 180° with Bump
(19B) facing up and reassemble.
5

NON STANDARD INSTALLATIONS

4" DIA
18C
18D
18A
19C
19A
HOT
COLD
19B
SHWR
TUB
18B
19B
19A
COLD
HOT
180°

Publicité

Table des Matières
loading

Table des Matières