Machine Description; Description Of Working Cycle; Description Of Controls; Technical Data - Bezzera BZ13 Manuel D'instructions

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

3 - MACHINE DESCRIPTION

3.1 Description of working cycle

The water coming from the tank on the back of the machine, via a pump, passes through a over
pressure valve regulated to 12 bar (1.2 MPa) and allows the boiler and the exchanger to be loaded.
The boiler water, heated up through a resistor, heats up the exchanger water from which, thanks to
a dip pipe, is convoyed to the group in order to brew the coffee by means of a valve electronically
controlled.

3.2 Description of controls

1
Main switch
2
Green light (PM)
2a Red light (DEPID-PMPID)
3
Yellow light (PM)
4 a Coffee distribution button (PM-PMPID)
4 b Coffee distribution buttons DEPID)
4 c Coffee button LEDs (DEPID)
5
Distribution unit
6
Filter holder
7
Water tap
8
Hot water distributor
9
Steam tap
10 Steam nozzle
11 Gauge 0-15 bar (DEPID-PMPID)
11a Gauge dual scale (PM)
11b PID (DEPID-PMPID)
12 Electrical power cable
13 1 cup filter
14 2 cup filter
15 Blind filter

3.3 Technical data

Power supply
Nominal power
Resistance
Boiler
Tank (S)
Width «A»
Depth «B»
Height «C»
Net weight
Gross weight (box)
All manuals and user guides at all-guides.com
(Fig. 01 - Fig. 10)
(Fig. 02)
V~/Hz
W
W
lt
lt
mm
mm
mm
kg
kg
220 – 240V~ / 50-60Hz
25
MOD. BEZZERA BZ13
110 – 120V~ / 50-60Hz
1400
1200
1,5
3
250
450
375
19
22

Publicité

Table des Matières
loading

Table des Matières