Drainage; Continuous Drainage - ecofort EcoQ DryAir 20L Manuel D'instructions

Masquer les pouces Voir aussi pour EcoQ DryAir 20L:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Drainage

Continuous Drainage

When the dehumidifier is operated at very high humidity
levels, the water tank will require more frequent drainage.
In this situation, it may be more convenient to set the unit
up for continuous drainage with the following procedures:
1. Connect the drain hole with a water tube of inner
diameter: 12 mm. Please note, the water tube is not
supplied with the unit.
2. Ensure the water will always drain away freely and the
tube will remain in its place.
3. Put the water tank back to its position.
40
While the water tank is full, the compressor will stop for self-
protection and the water full indicator will turn to red.
To move the water tank, pull it out squarely from the unit.
After emptying the water tank, place the water tank into space.
Make sure it is properly positioned, in order the 'water full' sign
to go out and your dehumidifier is operating.
Please note, in case, the water tank has not been positioned well,
the water full indicator will turn to red and the unit will not be
operating.
54

Publicité

Table des Matières

Dépannage

loading

Table des Matières