Kohler K-994 Guide D'installation page 6

Masquer les pouces Voir aussi pour K-994:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Hot Supply
Notch
3. Connect the Supplies
Apply sealant tape on the ½" NPT hot and cold supply pipes and
thread into the base.
NOTE: The base has a blue mark and a notch on the cold supply
side.
Insert the plug into the base.
Turn on the main water supply and check for leaks.
Turn off the main water supply.
Secure the guard onto the base with the screws provided.
1144501-2-C
Plug
Screw
Base
Cold Supply
6
Guard
Kohler Co.

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

K-10129

Table des Matières