Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

7.1 Maintenance plan

i
Before beginning service, disconnect from power. The work area around the lift is to be secured against unautho-
rised use.
Visual
Spray
inspection
Time frame
Position
Type of
maintenance
12
1
11
2
10
365 x / 12
9
3
4
8
5
7
6
12
1
11
2
10
365 x / 12
9
3
4
8
5
7
6
12
1
11
2
10
1 x / 12
9
3
4
8
5
7
6
12
1
11
2
10
1 x / 12
9
3
4
8
5
7
6
OPI_JUMBO LIFT 3500 NT_V4.0_DE-EN-FR-ES-IT
Oil
Lubricate
Check the polymer overlays and replace if required.
Model and information signs, labels, brief operating instructions, safety stick-
ers and warning information are to be cleaned and exchanged if damaged.
Check all available safety devices for function.
e.g.: CE stop, warning signal, blocking etc.
Exchange if damaged.
• Free the piston rod of the lifting cylinder of sand and dirt.
• Check the wiper for damage.
• Moving parts such as joint bolts and DU bearings, sliding pieces, sliding
surfaces and rollers are to be cleaned and checked for wear, exchange if
required.
• Lubricate all lubrication nipples with an acid-free multi-purpose grease. Do
not over-lubricate.
• Check the condition and function of the driving ramp.
• Check the condition of the cement floor.
• Check the torque of the fastening anchor. Also see the assembly protocol.
• The condition and function of the load suspension means are to be checked.
• Check the condition and function of all available safety devices.
All weld seams must have a visual inspection. Stop the system and contact the
manufacturer if there are cracks or breaks in weld seams of the lift.
Clean with
Clean
compressed
air
Maintenance plan
Inspect
83

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Jumbo lift 3500 hf x-tend

Table des Matières