Conformity With Standards; Technical Data; Function Display - Cooper Crouse-Hinds CEAG eBK 02 Mode D'emploi

Batterie pour atmosphère explosive
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

1. Safety instructions
For skilled electricians and trained
personnel in accordance with
national legislation, including the
relevant standards and, where
applicable, in acc. with IEC 60079-17 on
electrical apparatus for explosive
atmospheres.
The battery must not be operated in zone
0 or zone 20 hazardous areas!
The light fitting must not be use while
excessive deposit of dust (≥ 50 mm, accd.
EN 61241-0 und -1) exist.
The technical data indicated on the light
fitting is to be observed!
Changes or modifications to the battery
are not permitted!
The battery is only to be used as intended
and in undamaged and correct working
order!
Only genuine Cooper Crouse-Hinds (CCH)/
CEAG parts are to be used!
Repairs that affect the protection against
explosion, may only be performed by
CCH/CEAG or a qualified electrician (see
relevant national regulations)!
Observe the national health and safety
regulations for prevention of accidents
that are marked with a (
operating instructions!
Cooper Crouse-Hinds GmbH
6

2. Conformity with standards

The explosion protected device is conform to the
standards specified in the EC-Declaration of
conformity and of the EC directive for "Apparatus
and protective systems for use according to the
rules in hazardous areas" (94/9/EC) and
electromagnetic compatibility"(2004/108/EEC).
It has been developed, manufactured and tested
according to the state of the art and to
DIN EN ISO 9001:2000.
This device is suitable for use in zone 1, 2 21
and 22 hazardous areas according to
EN60079-14 and IEC 60079-10.

3. Technical data

EC type examination
certificate:
eBK 02 / eBS 09:
battery set 2710-3
Categorisation in accordance with 94/9/EC
and directive:
Approval of production
quality assurance:
Insulation class
to EN/IEC 60598:
Battery set:
Standard
Display of the charge
) in these
state:
Service indicator:
Rated capacity:
Charging time:
LED indication:
Duration of
emergency lighting:
Battery set dimensions: see fig. 1
Degree of protection
EN/IEC 60 529:
Operation temperature
Typ 2710-3
Storage temperature
in original packing:
less then 1 month:
Weight:
Cable glands certified 1 x M20 x 1.5,
accd. 94/9/EC
or
Note: New batteries will reach their total useful
1)
capacity only after 3 charging/discharging cycles.
For further technical data, see the operating
instructions
eLLK 92 NIB; eLLS 08 NIB (300 8000 1455)
and
eLLB 20 .. NIB (300 8000 2018).
BVS 09 ATEX E044 X
BVS 09 ATEX E042 U
II 2 G Ex d e mb ib IIC T4
II 2 D Ex tD A21 IP 66 T80°C
PTB 96 ATEX Q001-5
I
2710-3
5 x NiCd accumulators
with battery charging and
monitoring electronics
5 green LEDs
1 red LED
7 Ah
1)
approx. 14 h (>90%)
LED indication Recharging
(green)
time
approx. (h)
5 LEDs
0
4 LEDs
4.5
3 LEDs
7.0
2 LEDs
9.5
1 LED
12.0
0 LED
16.0
Can be set to either 1.5 h
or 3 hours
IP 66 (in conjunction with
the light fitting)
-25 °C up to +55 °C
+ 5 °C up to +35 °C
-40 °C up to +65 °C
approx. 1.8 kg
1 x blanking plug M25
connector system
GHG 57. (eXLink)
4. Function
Display
The battery 2710-3 fitted to the front of the
emergency light fitting is fitted with a microcom-
puter for charging and monitoring and with a
display composed of 6 light emitting diodes (fig.
1). The five green LED's indicate the battery's
charge state and available capacity. The red LED
signals possible failures (fig. 2 and 3).
Automatic function test
Function test (FT)
A function test (FT) is performed automatically.
During this process the emergency luminaire is
switched to battery supply for approx. 5 min. and
tested.
Partial operating time test (TBT)
Every 3 months a partial operating time test is
performed. If no emergency lighting operation >
30 min. has occurred during the last 3 months.
During this test emergency lighting operation is
performed for approx. 35 min.
Charging
The microcomputer controlled charging system
measures the charging and discharging current
and transmits it to a capacity meter. Five green
light emitting diodes indicate in 20%-steps the
actual charge state of the battery, see fig. 2.
Overcharging is prevented by means of this
charging control dependent on the capacity. Only
the energy drawn is recharged. The so-called
memory effect is thus also prevented.
At temperatures below -5°C and above +30°C the
battery will not be fully charged for
electrochemical reasons.
During the charging process the leading flashing
LED indicates the amount of capacity charged so
far. The LED's for the capacity already charged
indicate continuously (fig. 3). The charging
process is complete when all five green LED's are
illuminated and none is flashing.
The LED display takes into account the decline in
the capacity of the battery: i.e., if the indication
does not go beyond the 3rd green LED even after
an extended charging period, the available
capacity is between 40 and 60%.
This indication is updated again on each
emergency lighting operation until the battery is
shut down by the deep discharge protection for
the battery.
The reduction in the battery capacity due to self-
discharge in normal operation is automatically
recharged controlled by the microprocessor .
Emergency lighting operation
The duration of emergency lighting can be set to
either 1.5 or 3 hours, see eLLK 92 / eLLS 08 NIB
operating instructions (300 8000 1455).
Emergency lighting operation is automatically
initiated by the FT+TBT, by mains failure, or
manually by shutting down the mains supply.
During this process the emergency luminaire
marked in red is switched to battery operation.

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Ceag ebs 09

Table des Matières