CAME ZLJ24 Mode D'emploi page 8

Masquer les pouces Voir aussi pour ZLJ24:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 11
Electrical connection for the photocells functions test
(DIR)
(DOC)
At each opening and closing command, the control board assesses the effi ciency status of the control devices (photocells). Any anomaly
found is signalled with the fl ashing of the LED on the control panel. Consequently it cancels any commands coming from the remote control
or the button.
Electrical connection to enable the photocell safety test:
- the transmitter and the receiver, must be connected as per the diagram;
- from the functions menu, select "safety tests" and select either CX - CY - CZ input/s to activate the test.
The data and information reported in this installation manual are susceptible to change at any time and without obligation on CAME cancelli automatici s.p.a. to notify users.

Publicité

Table des Matières
loading

Table des Matières