Note: be sure not to permanently cement the stones above the spillway in place (Layer
9). Use caulk over the spillway instead of concrete or construction adhesive to allow for
future maintenance.
Layer 1
Layer 1
Layer 1
Layer 1
gap for 1½"PVC
gap for 1½"PVC
discharge line
discharge line
Layer 1
gap for 1½"PVC
gap for 1½"PVC
gap for 1½"PVC
gap for 1½"PVC
discharge line
discharge line
discharge line
discharge line
gap for 1½"PVC
gap for 1½"PVC
discharge line
discharge line
Set the plumbed basin in position with the 11/ 2 " Flexible PVC and optional Auto Fill supply line
Layer 3
feeding out the back of the basin through the notches. Set the bottom course of wall stones
gap for 1½"PVC
gap for 1½"PVC
discharge line
discharge line
along the back of the basin leaving a space for the 11/ 2 " flexible PVC and water source hose for the
Auto Fill (if needed). Continue with a layer of stone around the front of the basin (Layer 1).
Layer 3
Layer 3
Layer 3
Layer 3
Layer 5
Layer 5
Layer 5
Continue setting stones until the walls of the basin have been completely covered (Layers 2-3).
Layer 5
Leave a 1 1/ 4 " x 1 1/ 4 " hole for the the pump cord and thread the cord through. (Layer 4).
Layer 5
Layer 7
Continue building the back wall up (Layer 5-6).
Layer 7
Layer 7
Layer 7
Layer 7
The next levels will accept the spillway option chosen. Colorfalls and Color Changing Colorfalls
will need notches prepared to accept the base of the Colorfalls and the lip. Stainless Steel and
Copper Finish Spillways replace 4-inch high block; leave out one 12-inch block for the 12-inch
Layer 9
Spillway, 2 for the 24-inch Spillway, etc (Layers 7-9). Refer to spillway instructions for details.
Layer 9
Layer 9
Layer 9
Layer 9
Finish the columns to the height desired (Layer 10). Cap the spillways with the final course
of stone.
Layer 1
Layer 1
Layer 1
gap for Auto Fill
gap for Auto Fill
Layer 1
feed line
feed line
Layer 1
gap for Auto Fill
gap for Auto Fill
gap for Auto Fill
gap for Auto Fill
feed line
feed line
feed line
feed line
gap for Auto Fill
gap for Auto Fill
feed line
feed line
gap for Auto Fill
gap for Auto Fill
Layer 3
feed line
feed line
Layer 3
Layer 3
Layer 3
Layer 3
Layer 5
Layer 5
Layer 5
Layer 5
Layer 5
Layer 7
Layer 7
Layer 7
Layer 7
Layer 7
Layer 9
Layer 9
Layer 9
Layer 9
Layer 9
Layer 2
Layer 2
Layer 2
Layer 2
Layer 2
Layer 2
Layer 2
Layer 2
Layer 2
Layer 2
Layer 4
Layer 4
Layer 4
Layer 4
Layer 4
Layer 4
Layer 4
Layer 4
1.25" x 1.25" groove
1.25" x 1.25" groove
for cord outlet
for cord outlet
Layer 4
Layer 4
1.25" x 1.25" groove
1.25" x 1.25" groove
1.25" x 1.25" groove
1.25" x 1.25" groove
for cord outlet
for cord outlet
for cord outlet
for cord outlet
1.25" x 1.25" groove
1.25" x 1.25" groove
for cord outlet
for cord outlet
1.25" x 1.25" groove
1.25" x 1.25" groove
Layer 6
Layer 6
for cord outlet
for cord outlet
Layer 6
Layer 6
Layer 6
Layer 6
Layer 6
Layer 6
Layer 6
Layer 6
Layer 8
Layer 8
Layer 8
Layer 8
Layer 8
Layer 8
Layer 8
Layer 8
Layer 8
Layer 8
Layer 10
Layer 10
Layer 10
Layer 10
Layer 10
Layer 10
Layer 10
Layer 10
Layer 10
Layer 10
3