Step 12: Testing And Checkout - Honeywell HE120 Instructions D'installation

Masquer les pouces Voir aussi pour HE120:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

HE120 BY-PASS DRUM HUMIDIFIER

STEP 12: TESTING AND CHECKOUT

1. Complete the following checklist:
Humidifier is level.
Bypass Collar is secured with Sheet Metal Screws.
Damper is open (If installed).
Control wiring was reviewed per wiring diagram. (Fig. 51).
Water supply line has no kinks.
Overflow drain line slopes continuously down, does not
have kinks, and ends at floor drain or bucket.
2. Plug in transformer.
3. Open water supply. (Turn saddle valve clockwise until
you feel it is firmly seated, then turn valve counter clock-
wise to start the water flow.)
4. Remove Humidifier Cover and verify that Water Pan fills
and water shuts off before water enters Overflow Tube.
5. Adjust water level to 1-3/8 in. deep by turning the
adjustment screw on the Float Valve. See Fig. 52.
(Clockwise to lower water level, counter-clockwise to
raise water level.)
6. Turn Humidistat "ON".
7. Make sure the Humidistat Drum Assembly is rotating.
8. Snap Humidifier cover into place.
9. Check for water leaks at the saddle valve fitting and
Float Valve fitting. (If necessary, tighten fittings.)
10. Reset the Humidistat to a comfortable setting for auto-
matic operation. (See owner's manual for more details.)
69-1860EF—01
LOWER
WATER LEVEL
(CLOCKWISE)
Fig. 52. Adjusting water level.
20
RAISE
WATER LEVEL
(COUNTER-
CLOCKWISE)
M13637

Publicité

Table des Matières
loading

Table des Matières