Installing Backsplash with Mobile System
Align the side ends of the
4
slatwall with the side ends of the
worktop
Interlock bottom of Slatwall Section
6
with the top of Mobile Bottom and
follow steps 5 to 8 on page 7.
8
8
Ensure that the Mobile Bottom is
tight against the wall and the top
5
of the worktop. Pre-drill 3mm (1/8")
holes into each stud then fasten
Mobile Bottom Strip with screws
provided.
Remove protective adhesive
7
film on the back of Mobile Side
Covers. Press firmly to adhere to
the wall.
Masonry.
•
Follow steps 4 to 8.
•
Drill pilot holes through the perforated
strip each 16in with hammer drill &
masonry bit.
•
Use 2¼" x ¼" Tapcon Concrete Anchor
for each pilot hole. (Not Included)
• OR use #10 x 2" Screw with ⁄ " masonry
plug for each pilot hole. (Not Included)
www.newageproducts.com