5. Installation Check-up
WARNING: AFTER INSTALLATION, CHECK TO SEE IF THE MACHINE IS WORKING PROPERLY (see the
Installation Module C)
WATER CONNECTIONS
•
No leaks from the connections or tubes
FUNCTIONING
•
Boiler and operating pressures are normal.
•
The pressure gauge is working properly.
•
The self-levelling device is working properly.
•
The expansion valves are working properly
WARNING: ONCE THE MACHINE HAS BEEN INSTALLED AND IS READY FOR USE, BEFORE ALLOWING
THE WORKER TO START USING THE MACHINE, WASH THE INTERNAL COMPONENTS ACCORDING
TO THE INSTRUCTIONS BELOW:
GROUPS
•
Hook up the lter holders to the groups (without coffee).
•
Let each group dispense water for about a minute.
HOT WATER
•
GT - HD: continuously dispense hot water (pressing the appropriate button) until at least 5 litres of water have been
used.
DT: continuously dispense hot water (pressing the appropriate button) until at least 5 litres of water have been
dispensed for a machine with 2 groups, 8 litres for a machine with 3 groups and 10 litres for a machine with 4 groups.
See the "Hot water dispensing" chapter in the User's Manual.
STEAM (also with Turbosteam)
•
Dispense steam from the nozzles for about a minute, using the appropriate buttons.
TURBO MILK (where applicable)
•
After removing the intake tube from the milk container, carry out a few test cycles.
.
6 EN