Kimex 013-4040 Instructions De Montage page 10

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Step1
Mounting the In-wall box
In-wall box must be installed between two studs
16" on center. Use an edge-to-edge stud finder(Fig.1.1)
to locate the edges of the stud. Based on its edges,
draw two vertical lines down the inside edges of
'
stud s. Mark desired center of in-wall box. Draw a
horizontal line 6" (153 mm) above center of
.
in-wall box Draw a second horizontal line
12" (306 mm) below this line to outline wall
opening between inside edges of studs. Remove
drywall inside cut outline.
NOTE: In-wall box can be installed for right
side mount orientation as shown in Fig 1.2.
Insert in-wall box into cut out until flange is
flush with drywall. Level in-wall box and mark
the position of two mounting holes using holes on
mounting tabs. Remove in-wall box and pre-drill
5/32" (4 mm) dia. holes 2" (50.8 mm) deep using
the locations previously marked. Reinstall and
.
level in-wall box Secure using two
wood screws as shown in Fig
Not es:
W e do not r ecom m end usi ng a dr i l l dr i ver or i m pact w r ench t o
t i ght en bol t s.
Ti ght en l ag bol t s so t hat w al l pl at e i s f i r m l y at t ached t o w al l ,
but DONO T over t i ght en. The l ag bol t s can be dam aged by
over t i ght eni ng w hi ch w i l l st r i p t hei r t hr eadi ng.
Fi nal t i ght eni ng of l ag bol t s shoul d be done by hand usi ng
a r at chet w r ench and socket .
TOP
Flange
Fig.1.2
-
,
lagbolts x
6
5
0
mm
1. 3.
CUT
OUTLINE
CENTER OF
IN-WALL BOX
Lag bolt
6x50mm
3 of 7
Fig.1.1
TOP
Mounting
Tabs
Fig.1.3

Publicité

Table des Matières
loading

Table des Matières