Premier Mounts AM175 Guide D'installation page 5

Masquer les pouces Voir aussi pour AM175:
Table des Matières

Publicité

5
1)
Level the Mount.
2)
Use a pencil to mark the remaining three (3) mounting locations along the
center of each wall stud.
6
Two people are recommended for this step; one person to level the
Mount and another person to drill the pilot holes.
Il est recommandé deux personnes pour cette étape : une personne
pour niveler le Mont et une autre personne pour percer le forage de
guidage.
Drill a "pilot hole" in the center of each of the marks with a power drill and a
1/4" drill bit.
Only use 1/4" drill bit when drilling the pilot holes.
N'utiliser qu'un foret de 1/4" lors du forage de guidage.
7
1)
Insert one (1) 5/16" x 3" lag bolt and one (1) 5/16" washer into each pilot holes.
2)
Tighten all lag bolts using a socket wrench and 1/2" socket.
Do not overtighten the lag bolts when attaching the mount to the wall.
Improper installation may result in personal injury or property damage.
Éviter de trop serrer les tirefonds lors de la fixation du support au
mur. Une installation incorrecte peut entraîner des blessures ou des
dommages matériels.
Installationsanleitung, Guía de Instalacíon, Guida de Installazione, Guide d'Installation, Installatie gids
AM175
Installation Guide
Page 5

Publicité

Table des Matières
loading

Produits Connexes pour Premier Mounts AM175

Table des Matières