Testing The Installation - Hoover HI1X8 Manuel D'instructions

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

40002960Eng.qxd
12/04/2005

Testing the installation

This
programme
will take
approximately
2 hours to
complete.
12
15:11
Page 12
Refer to the programme guide for details of how
to select programmes.
1.
Turn on the water supply and check for
leaks from the fill hose.
2.
Switch on the electricity supply.
3.
Select the Essorage programme (15) and
then press the Départ/Pause button to start
the machine. Allow the programme to
continue for one minute and then cancel
the programme by returning the selector to
the ARRÊT position. This will remove any
water remaining in the machine from
factory testing.
4.
To check for cold water filling to the
machine:
Select the Rinçage programme (14) and
press the Départ/Pause button to start the
machine.
Allow the tumble action to continue until
the water has pumped out. Check that the
drain outlet is not leaking or overflowing.
5.
Switch off the machine at the end of the
cycle by turning the programme knob to the
ARRÊT position.
6.
Select the Essorage programme (15) and
press the Départ/Pause button to start the
machine. If the machine takes longer than
one minute to empty check the drain hose
for kinks.
Installation testing is now
complete.
Now you have successfully installed the machine
we advise that you run the machine to ensure the
drum is thoroughly clean after testing and
storage. Select COTON RESISTANT 90 and run the
machine for a complete cycle using only wash
detergent and water.

Publicité

Table des Matières
loading

Table des Matières