Pressurizing Cooling Tank (continued)
STEP 6
Unplug JG tubing from the cooling tank outlet. Do not set it down.
STEP 7
Using tubing removed in Step 6, plug into JG elbow on the right
side of the valve. (Be sure to re-route the tubing under existing
tubing installed in Step 4 as shown.)
STEP 8
Using tubing that is connected to the JG elbow left side of valve
(done in Step 4, plug the other end to the JG fitting at the top of
the cooling tank.
Return to Section 3B, "Connecting the water line"