SECTION 3: INSTALLATION
C. MOUNTING THE FRAME TO THE WALL
STEP 1:
Place rubber gasket on top of the cooler so it is centered left/right and against the wall. (Figure 11)
STEP 2:
Set the wall frame onto the gasket. Center it left/right and push it against the wall and mark hole locations for wall fasteners. The gasket will
set the frame at the proper height. Use mounting slots that will provide the proper securing location. Make sure to pull the plastic tubing up
through the hole in the frame. (Figure 12)
STEP 3:
Secure frame to the wall with fasteners (not provided).
STEP 4:
Slide sponge tubing insulation over water line.
Connect the tubing to the INLET elbow on the
back of the Hands-free Bottle Filler assembly and
flow switch connector into the port on the circuit
board. (Figure 13)
STEP 5:
Set the bottle filler
cabinet into place.
As you do, feed the
terminals on the
power supply cord and
the long green ground
wire through the bush-
ing on the cooler top.
MAKE SURE the cabi-
net fits into the groove
in the rubber gasket
on both sides and
front of the cabinet
wrapper. (Figure 14)
02/20 | Franke 036865-047
Figure 11
Make sure to pull
the plastic tubing
up through the
hole in the frame.
Insert
connector on
end of flow
switch wire
into port on
circuit board
Rear view of Bottle Filler
Figure 14
Figure 12
Use mounting
slots that will
provide the proper
securing location.
Figure 13
Connect tube
to inlet of the
valve
Plastic tubing
Sponge tubing
insulation
Bottle filler cabinet
Groove in the gasket
12