Check For Leaks - GE PGP976 Instructions D'installation

Table de cuisson scellée au gaz de 91.4 cm (36”)
Masquer les pouces Voir aussi pour PGP976:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

5 CHECK FOR LEAKS

LEAK TESTING OF THE APPLIANCE SHALL BE
CONDUCTED ACCORDING TO THE MANUFACTURER'S
INSTRUCTIONS.
Before testing for leaks, make sure all burner knobs
are in the OFF position.
After connecting the cooktop to gas, check system
for leaks with a manometer. If a manometer is not
available, turn the gas supply on to the cooktop
and use a liquid leak detector at all joints and
connections to check for leaks.
Tighten all connections if necessary to prevent gas
leakage in the cooktop or supply line.
DO NOT USE OPEN FLAME TO CHECK FOR
LEAKS!
Disconnect the cooktop and its individual shut-off
valve from the gas supply piping system during any
pressure testing of that system at test pressures
greater than 1/2 psig (3.5 kPa).
Isolate the cooktop from the gas supply piping
system by closing its individual shut-off valve
during any pressure testing of the gas supply
system at test pressures equal to or less than 1/2
psig (3.5 kPa).
Installation Instructions
7
6 INSTALLATION OVER BUILT-IN
OVEN
See built-in oven installation for complete
installation instructions.
90° Elbow
Cabinet Sides
View from Front of Cooktop
5" To Center of
2" Dia. Hole From
Countertop
2" Dia. Hole
(20 7/8" from front
of Countertop to
Hole Center)

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Pgp986Cgp650

Table des Matières