Télécharger Imprimer la page

Valor G4 Floating Trims 792FTZ Manuel D'installation page 2

Publicité

Les langues disponibles

Les langues disponibles

Installation
1. Identify the left and right panels, top and bottom
using the image below. The space between the pin
and the top of the panel is wider than the space
between the bottom pin and the bottom of the
panel.
Left panel
Front view
Rear view
2. Insert the top pin of the left panel in the hole at
the top of the left shroud already installed on the
appliance.
3. Lift the panel as far as possible and insert the
bottom pin in the hole at the bottom of the shroud.
The panel should rotate freely.
4. Install the right panel the same way.
2
TOP of panel:
this space is
wider
BOTTOM of panel:
this space is
narrower
5. Hook the barrier screen to the shrouds.
6. Hook the front trim to the shrouds in the same slots
as the barrier screen.

Publicité

loading

Ce manuel est également adapté pour:

G4 floating trims 792ftv