KOBE CH7730SQB Manuel D'installation Et Mode D'emploi page 11

Masquer les pouces Voir aussi pour CH7730SQB:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

2.
Remove the baffle filters and spacers. If necessary, arrange the electrical wires to run
through the 1" diameter hole on the top or the rear of the hood. Refer to Figure 5.
3.
Using references on Table 1 and measurements on page 20 center the hood in place
beneath the cabinet and flush with the front of the cabinet.
4.
Draw electrical wires through cabinet access opening.
5.
Place screw (not provided) into the exact center of each knockout hole. Make sure all
screws are in place before tightening screws. CAUTION: MAKE SURE THE HOOD IS
SECURE BEFORE RELEASING.
Ductwork Installation
6.
Use aluminum or steel pipe to connect the plastic exhaust on the hood to the ductwork
above. Use duct tape to make all joints secure and air tight.
7.
Continued at "Wiring to Power Supply" on page 16.
Figure 4
9
1" Diameter
Hole
Figure 5

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Ch7736sqb

Table des Matières