Pinguino PAC L90 Mode D'emploi page 6

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

I n s t a l l i n g y o u r p o r t a b l e
• Open the
French window slightly and
12
position the outlet
and C1.
• Use the suction pads
the two parts of the window together (fig.
D and D1).
D
SEMI-PERMANENT INSTALLATION
If required, the Pinguino can also be installed
semi-permanently (Fig. E and E1).
11,8 inches
30 cm
E
Proceed as follows:
• Drill a hole in an outside wall or through a
window pane.
Respect the height and dimensions of the
hole given in figure F.
6
All manuals and user guides at all-guides.com
a i r - c o n d i t i o n e r
as shown in figure C
13
provided to hold
D1
11,8 inches
30 cm
E1
in the window
in the woo-
pane
den
board of a
French
dow
F
Keep the air hoses as short and free of
curves as possible to avoid constrictions.
• Fit the flange accessory
the hole
11
18
• Fit the hose
/
back of the appliance (fig. A / A1 page 5).
• Fit the end of the hose
10
ge
as shown in fig. G.
11
18
When the hose
/
led hole can be closed with the flange cap
10
.
NOTE.
When installing the air conditioning unit semi-
permanently, you should leave a door slightly
open (as little as 1/2 inches (1 cm) ) to gua-
rantee correct ventilation.
in the wall: you are
kick-
recommended to
insulate the sec-
win-
tion of wall using
suitable insulation.
10
provided in
in the housing at the
11
18
/
to the flan-
G
MAX 39.37 inches
MAX100 cm
MIN 13.77 inches
MIN 35 cm
is not fitted, the dril-

Publicité

Table des Matières
loading

Produits Connexes pour Pinguino PAC L90

Table des Matières