Complete The Installation - Kohler K-4915 Guide D'installation

Masquer les pouces Voir aussi pour K-4915:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Control Unit

4. Complete the Installation

Connect
Using a Phillips screwdriver, remove the four screws from the
cover of the battery compartment. Set the four screws and cover
aside.
Install four AA alkaline batteries into the battery holder assembly.
Reinstall the cover to the battery compartment.
Plug the solenoid lead into the control unit lead. Wait 10 minutes
before proceeding.
Test
Stand in front of the urinal for at least 10 seconds.
Step aside from the urinal. The valve will flush after a slight
delay.
Checkout
Check the entire installation for leaks.
Repair as needed.
If cover locks will not be installed, place the cover on the tank. If
cover locks will be installed, proceed to the "Install the Cover
Locks" section.
1020643-2-D
All manuals and user guides at all-guides.com
Screw
Cover
Batteries
Battery Compartment
Solenoid Lead
Control Unit
Lead
6
Kohler Co.

Publicité

Table des Matières
loading

Table des Matières