4. List of the equipment supplied
Your chlorinator is supplied with the following equipment :
•
1 complete electrolysis cell.
•
1 electric control unit.
•
1 cell power supply cable.
•
1 salinity and temperature sensor.
•
1 accessories stand.
•
2 short 63/50 reducers.
•
1 paddle-operated flow switch.
•
1 wall mounting kit.
•
2 cable glands to be installed on the unit.
•
1 salt/hardness analysis kit.
•
1 installation and user's manual
5. Installing the chlorinator
For safety reasons, the chlorinator must be electrically slaved to the water flow rate in the by-pass and filtration pump.
5.1 Hydraulic connections of the cell
The chlorinator's cell must be installed on the return circuit downstream from the filter and any heating systems (particularly
electric heater)
A « by-pass » installation is recommended so that it is easier to work on the chlorinator and for wintering purposes.
The electrolysis cell can be positioned anywhere but it is preferable to use a configuration that facilitates the evacuation of air
bubbles. The accessories' stand must be installed upstream from the cell.
5.1.1 Horizontal by-pass configuration
5.1.2 Vertical by-pass configuration
NOTESD - IND B – 02/2012
All manuals and user guides at all-guides.com
21 / 52
Measure of saltiness
Medida de salinidad
Measure of saltiness
Medida de salinidad