Venting Options; Preparation - BLAZE 42 Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

BLAZE OUTDOOR PRODUCTS
|
5

venting options

Remember to plug in and test the hood prior to installation When planning for the installation of the vent hood please include an opportunity to access the top of the hood when the installation is
complete This is necessary for service
plug into the top of the hood and then into an 110 V
a single pipe Combining into a single pipe can create a competition between
the two motors either creating poor performance and/or one motor overtaking
the other It is also recomended to have a vent cap with a damper and screen
whose exhaust capabilities mimic that of the discharge of the pipe As vented as
described above, one would require two vent caps with damper and screen
each having a rating of 1,000 CFM per cap
wall hood installation

preparation

horizontal wall venting
and or replacing parts over time as there are several fasteners that will need to be accessed
GFI protected outlet that should be wired to a 15 AMP breaker
USER MANUAL
step 1
|
6

Publicité

Chapitres

Table des Matières
loading

Table des Matières