Norton Clipper CP512-300 Traduction De La Notice Originale page 67

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Preparing for use
g
j
k
i
14
d
13
d
e
ENGLISH 22
k
m
2
n
g
d
Loosen and turn assembly flange (j)
 Put the wheel guard on a level surface with the
assembly flange (j) pointing up (screws (g) of the
assembly flange point up).
 Turn out screw (k).
Hold the nut below the assembly flange with flat
pliers.
 Twist the assembly flange against the wheel
guard so that the receptacle bore for the
screw (k) is located between the centre stop and
the right stop (m) on the wheel guard. The
assembly flange is hard to twist. Securely hold
the wheel guard when twisting.
Limit wheel guard rotating angle with screw (k)
 Turn in screw (k) again.
For this, guide the nut (n) below the assembly
flange with flat pliers and hold it when turning in
the screw.
Turning of the wheel guard is limited by the stops
on the wheel guard between which the nut can
be moved.
Install cutting device in the outer position
 Put the cutting device on the cutting device
carrier in the outer position. For this, guide both
screws (g) of the assembly flange through the
oblong holes and put the ribbed belt support (i)
into the ribbed belt.
 Check that the ribbed belt is running freely.
Correct placement of the ribbed belt if required.
 Put on the ribbed belt cover (14) again.
Adjust the ribbed belt tension
 Screw both attachment nuts (d) of the ribbed belt
cover onto the assembly flange screws. Only
tighten the nuts manually so that the ribbed belt
tension can still be set.
 Turn ribbed belt tension screw (13) towards the
right, e.g. clockwise, to increase the ribbed belt
tension). The correct tension is reached when
the square nut (e) is on the centre mark, i.e.
between "+" and "−".
 Tighten both attachment nuts (d) firmly.

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Clipper cp514-350Clipper cp512-300iClipper cp514-350i

Table des Matières