Coffee Grinder CM 80 / CM 81
Dispose of the packing
The packing protects the unit from
shipping damage. The packing
materials are selected for their en-
vironmental compatibility and from
disposal aspects so they are recy-
clable.
Returning the packing to the ma-
terials circuit saves raw materials
and reduces the accumulation of
waste. Dispose of packing material
that is no longer needed at a col-
lection point for the »Green Point«
recycling system.
important!
If possible, save the original
►
packing during the unit's
warranty period to be able to
properly pack the unit in case
of a warranty claim.
Requirements for the in-
stallation location
For safe and flawless operation of
the unit, the place of location must
meet these prerequisites:
The unit must be set up on a
■
firm, flat, level, non-slip and heat
resistant base that has sufficient
load bearing capacity.
Select the place of location so
■
that children cannot reach the
hot surfaces of the unit.
■
The unit is not intended for in-
stallation in a wall or a built-in
cupboard.
All manuals and user guides at all-guides.com
© Gebr. Graef GmbH & Co. KG - 04
Do not set up the unit in a hot,
■
wet or moist environment.
The electric socket must be read-
■
ily accessible so that the power
cord can be easily unplugged.
Electric connection
Follow these instructions about the
electrical connection for safe and
flawless operation of the unit:
Before connecting the unit, com-
■
pare the connection information
(voltage and frequency) on the
rating plate with those of your
electrical network. This informa-
tion must match to avoid dam-
age to the unit. If in doubt, ask
your electrician.
The socket must be fused with at
■
least a 10A circuit breaker.
Make sure that the power cord is
■
not damaged. Do not conduct it
over hot surfaces or sharp edges.
The supply cord must not be
■
pulled tight.
The electrical safety of the unit
■
is only ensured if it is connected
to a properly installed protective
conductor
system.
on a socket without a protec-
tive conductor is prohibited. If in
doubt, have the building instal-
lation checked by an electrician.
The manufacturer does not as-
sume any responsibility for dam-
ages caused by a missing or in-
terrupted protective conductor.
EN
Operation
21