Mechanical Overloading—The device must be level, stable, and
secure to prevent it from sliding or shifting out-of-position.
Circuit Overloading—Adding the device to the power outlet must not
overload that circuit.
Rack-Mount Placement
Remove the four screws from each side near the front of the switch.
S
1
TEP
Retain the screws for re-installation. (Do not remove the four screws
from each side near the back of the switch.)
Place one of the supplied spacers on the side of the switch so the
S
2
TEP
four holes of the spacers align to the screw holes. Place a rack
mount bracket next to the spacer and reinstall the four screws
removed in
If your screws are not long enough to reattach the bracket with
N
OTE
the spacer in place, attach the bracket directly to the case without the
spacer.
Repeat
Step 2
S
3
TEP
After the mounting hardware has been securely attached, the
S
4
TEP
switch is now ready to be installed into a standard 19-inch rack.
For stability, load the rack from the bottom to the top, with the
C
AUTION
heaviest devices on the bottom. A top-heavy rack is likely to
be unstable and might tip over.