Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

2 INSTALLATION
2C-5. Ozone Tube Connection - Refer to Figure 3b.
After the system has been set for the correct flow rate, remove the flow
meter assembly and connect the ozone tube between the ozone outlet
barb on the DEL Ozone generator, and the tube adapter on the injector
assembly. Ensure that the check valve arrow is pointing toward the injector.
If equipment is above water level, cut off the excess tubing so that the line
from the injector to the DEL Ozone generator is as straight and free from
dips and loops as possible. If equipment is below the water level, run tubing
to a point above water level. Ensure that all tube connections are secured
with clamps.
2D. Electrical
2D-1. Main Power
This device is intended to be installed by a certified electrical technician, in
accordance with local electrical codes. Connect the DEL Ozone generator
to the pool timing clock so that the DEL Ozone generator operates
simultaneously with the pool pump. The DEL Ozone generator has three
available knockouts for a 1/2 inch conduit fitting, two on each side and
one on the back. Remove only the ideal knockout and install the proper
conduit fitting. Open the enclosure and locate the terminal block. Connect
Line 1, Line 2, and ground to the terminal block as indicated by the label
on the inside of the enclosure door. Refer to the IMPORTANT SAFETY
INSTRUCTIONS at the beginning of this manual for important wiring
information.
2D-2. Earth Grounding Lug
Using an 6 AWG (13.3 mm2) conductor, connect the grounding lug on the
bottom of the DEL Ozone generator to an appropriate earth contact.
3A. General
6

Publicité

Table des Matières
loading

Produits Connexes pour CMP DEL OZONE 25

Ce manuel est également adapté pour:

Del ozone 50Del ozone 100

Table des Matières