FG01 G-Series Smart Pull
Setup and Installation (cont'd)
Installing the Rope
1. Twist pins counterclockwise and pull out.
2. Remove outer rollers.
3. Lay rope over three inner rollers.
4. Replace outer rollers.
5. Push pins straight in; do not rotate.
6
Greenlee Tools, Inc.
4455 Boeing Dr. • Rockford, IL 61109-2988 USA • 815-397-7070