AirKing ECQ Serie Manuel D'utilisation page 2

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

INSTALLATION INSTRUCTIONS
CAUTION:
SERVICE PANEL BEFORE STARTING INSTALLATION.
SECTION 1
Preparing the Range Hood
1.
Unpack hood from the carton and confirm that all pieces are present. In addition to the
range hood you should have:
2 - Aluminum Grease Filters
1 - 3-1/4"x 10" Duct Collar
3 - Duct Collar Mounting Screws
4 - #8 Mounting Screws
1 - GU24 Base, 8W LED Lamp
1 - Instruction/Safety Sheet
NOTE: Some hoods may be shipped with a protective plastic adhered to the range hood. It is
recommended to leave this in place during installation to protect the hood from scratching.
Remove when the installation is complete.
2.
Lay the hood flat on a table so the underside is facing you. Use a piece of cardboard to
avoid damaging the table or the hood.
Remove the following items from the hood and place in a safe place until needed (Figure 1):
3.
Grease filters: Pull on tabs to remove.
Bottom cover: Remove the 4 screws holding it in place.
Lamp cover: Squeeze in the sides. The cover is held in place by tension against the tabs
on the hood.
Wire compartment cover: Remove the screw holding it in place.
Blower: Using a 3/8" nut driver or ratchet, remove the 4 nuts holding the blower in place.
Grease
Filter Tab
Figure 1
SECTION 2
Prepare the location for Hood Support
1.
If the hood will be installed under cabinets that have a recessed bottom, it will be necessary
to install wood mounting strips (not included) so the hood will mount properly (Figure 2).
Wood Strip
Figure 2
2.
The thickness of the strips should be the same as the recess of the cabinet and they
should be approximately 2" wide.
3.
Install the strips using appropriate length wood screws (not included). Make sure the
strips line up to the keyhole slots of the range hood.
6728061 Rev. K 9-19
MAKE SURE POWER IS SWITCHED OFF AT
Lamp Cover
Motor
Bottom
Wire
Cover
Compartment
Cover
SECTION 3
Prepare the Hood for Installation
1.
To ensure the best air and sound performance, it is recommended that the length of
ducting and the number of elbows be kept to a minimum, the radius of each elbow be as
large as possible for the installation, and that hard ducting be used. Larger duct sizes will
reduce noise and airflow restrictions. This model is equipped to vent either Vertically or
Horizontally through a 3-1/4" x 10" duct.
2.
Remove the appropriate square knockout by inserting a screw driver under the edge and
break the tabs holding it in place. Peel back with pliers (Figure 3).
Figure 3
3.
Determine where the electrical service will enter the hood and remove the appropriate
electrical knockout by inserting a screw driver into the slot and rocking back and forth
until the knockout comes loose (Figure 3).
4.
Once the proper knockout(s) have been removed, either hold the hood up to the
installation location and mark the locations of the ducting, electrical, and mounting holes
or mark the locations by measurement.
5.
Cut appropriate holes for ducting connection and electrical connection in the wall/cabinet.
6.
Install the damper assembly to the hood by sliding the tabbed section of the duct collar
under the hood body and securing with the two provided screws. Using approved duct
tape, tape around the collar to seal off any air leaks (Figure 4).
Damper
Figure 4
7.
Install an approved wire connector to the electrical knockout of the hood and guide the
electrical cable through the hood, allowing at least 6" of wire for connections and tighten.
SECTION 4
Blower Installation
NOTE: When reinstalling the blower, ensure that
the blower is facing the same way as how you
have chosen to duct it.
1.
With the opening of the blower facing the
direction you have chosen to duct the
hood, place the blower mounting brackets
(brackets on either side of the blower) over
the blower mounting studs on the interior of
the hood (Figure 5).
NOTE: Makes sure to support the blower in
position by hand until it is firmly secured to the
hood.
2.
Using the 4 nuts removed earlier, secure the
blower in place. Start the nuts by hand first,
then tighten with a 3/8" nut driver or ratchet
until they are fully seated (Figure 5).
3.
Plug the blower into the appropriate
connector on the side of the wire
compartment. It will only fit one way
(Figure 6).
www.airkinglimited.com
Vertical
Figure 5
Horizontal
Hood
Body
Tab
Horizontal
Studs
Vertical
Studs
2 of 12

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Ecq366Ecq303

Table des Matières