Maytag MDE17MN Instructions D'installation page 21

Masquer les pouces Voir aussi pour MDE17MN:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Connecting 4-Wire Connection: Direct Wire
Connecting Ground and Neutral Wires (cont.)
2. Connect ground and neutral wire to center terminal block.
Connecting Direct Wire Ground
3. Connect ground wire (green or bare) with external ground
connector screw.
Connecting 3-Wire Connection: Direct Wire
Use where local codes permit connecting
cabinet-ground conductor to neutral wire.
Direct wire cable must have 5 ft. (1.52 m) of extra length so
dryer can be moved if needed.
Strip 3
" (89 mm) of outer covering from end of cable. Strip
1
2
insulation back 1" (25 mm). If using 3-wire cable with ground
wire, cut bare wire even with outer covering. Shape ends of
wires into a hook shape.
Connecting Neutral Wire
1. Loosen or remove center terminal block screw.
All manuals and user guides at all-guides.com
ELECTRIC DRYER ELECTRICAL CONNECTIONS
Connecting Remaining Wires
4. Connect remaining wires to outer terminal block.
2. Connect neutral wire to center terminal block.
3. Connect remaining wires to outer terminal block.
21

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Mdg17mnMde17csMdg17cs

Table des Matières