Télécharger Imprimer la page

Publicité

Step 11
We have provided a Nail Holder tool to use in this step for proper
å
positioning of the NAILS. Please refer to the parts of the Nail Holder
as the bead, off set edge, and nail slot as shown in Diagram 1.
Unfold the LARGE BACK (H3) and lay it over the top of your unit.
å
Diagram 2. Place the LARGE BACK (H3) into the edges of the UPPER ENDS (A3
å
and B3), with the top edge of the LARGE BACK (H3) even with the top surface of the TOP (E3).
Diagram 3. To fasten the top edge of the BACK (H3), place the off set edge of the Nail Holder down against
å
the TOP (E3). Place a NAIL into the nail slot of the Nail Holder. Tap the nail through the BACK and into the edge
of the TOP (E3). Remove the Nail Holder from the NAIL and completely tap the NAIL in with your hammer. Finish
fastening the BACK to the TOP with the hammer and Nail Holder placing NAILS approximately 5-1/2" apart.
Diagram 4. To fasten the side edges, place the bead of the Nail Holder down between the LARGE BACK (H3) and the
å
UPPER LEFT END (B3) 1-1/2" from the corner. Place a NAIL (1N) into the nail slot of the Nail Holder. Tap the NAIL through
the BACK and into the lower edge of the UPPER LEFT END. Remove the Nail Holder from the NAIL and completely tap the
NAIL in with your hammer. Finish fastening the BACK to the UPPER LEFT END with the hammer and Nail Holder placing
NAILS approximately 5-1/2" apart. Repeat this process for the UPPER RIGHT END (A3).
Off set edge
Nail
Holder
Bead
NAIL
(26 used in this step)
Page 16
Nail slot
1.
1N
A3
H3
Caution
Do not stand the unit upright without the
BACK fastened. The unit may collapse.
These edges
must be even.
E3
B3
Nail slot
Lower edge
2.
Off set edge
3.
1-1/2"
4.
5-1/2"
Bead

Publicité

loading