Frame Heater; Central Plant Connection Ready Models (Cc) - Porkka Future Instructions D'emploi Et Montage

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 58
"P1"
Thermostat probe failure*
"P2"
Evaporator probe failure*
(not in chiller cabinets C)
"P3"
Condenser probe failure*
"P4"
Extra probe failure*
*Note! The cabinet operates on its standby
system and will hold normal temperature, but
reset the alarm signal and immediately contact
your service provider.
"EE"
Data failure*
In case of an "EE" alarm reset the alarm and
restart the equipment by pushing any key for 3
seconds until the code "rSt" is displayed.

FRAME HEATER

The door frame of the cabinet is heated to prevent the gasket
from freezing. The heater operates fully automatically.
The ice that may appear on the surface of the evaporator must
not be removed with any sharp instrument!

CENTRAL PLANT CONNECTION READY MODELS (CC)

According to the Machinery Directive, 2006/42/EC central plant
ready cooling units and cabinets are classed as
semi-fi nished products, where the company who installs the
remote refrigeration machinery or connection to a central
plant, is responsible for completing the machinery. In this case,
the installer of the refrigeration machinery that operates the
equipment is classifi ed as the manufacturer.
The meaning of the Directive, is that the manufacturer is
responsible and obligated for placing the machine on the
market and as such has to undertake CE marking of the
complete machine, maintenance of operation, service and other
instructions as well as the technical construction fi les and the
testing and adjustment of the machine. For more information
see our separate declaration of incorporation.
6

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Future plus

Table des Matières